Friday, September 24, 2010

Welcome class!
It is my goal to upload class information on this blog throughout the school year. I also plan to use the blog site for class critiques and other informal asspects of the class.
I will also answer any questions you my have about current projects.

Saturday, October 11, 2008

Monday, September 22, 2008

Art Club & Art Team

Art Club
September Workshop
Under Water Mural Painting
When: September 30th After School Rm. F107
Bring old cloths and $1 if you want pizza

Art Team
One site try outs for art team are Friday October 3rd after school. Plan on staying for at least three hours. Bring along your four sketches to be judged. Good Luck at Try-outs!

Week 4: September 21-26

Art I
Project: Accordion Book- Finish the last three Definitions of Principles; Movement, Balance and Unity. This Accordion Book was our first project in class. Students listed the Elements of Design on one side of the book (Shape, Line, Color, Value, Form, Texture and line) and the Principles of Design on the other side (Pattern, Balance, Rhythm, Movement, Emphasis, Contrast and Unity). Each page had a definition of the learned term and showed an example of it in a drawing.
Due Date- Tuesday 9/22
Materials: Colored Pencils

Project: Color Theory Painting- On Tuesday students will be transfering their unity drawing from their accordion books to a 12" X12" piece of water color paper. They will then divide the paper into 9 sections. Wednesday students will learn the proper technique for watercoloring and brush care. They will learn color terms and show examples of these terms within each section of their painting. Here are the terms in order given in class: Primary, secondary, complementary, intermediate, warm, cool, analogous, monochromatic and neutral.
Due Date- Tuesday 9/30
Materials needed: None (own brush-optional)


Jewelry/Textiles
Project: Linked Spiral Bracelet- I am looking to see that all links are relativly similar in size and design. Proper connections are made and that there is a functional hook.
Due Date: 9/23
Materials: 18 Gauged wire and tools

Project: Your Designed Links- Students are to design their own links to create a necklace. There should not be any more than two different links. They are to use equal number of links if using more than one link. I am looking to see that all links are relativly similar is size and design. The necklace must be functional with a clasp. Size and design are left up to the designer.
Due Date: 9/26
Materials: 20-24 gauged wire, tools and beads are optional.

Altered book
Check Date: Friday 9/26
At least one page needs to be completed
This weeks ideas:
* Picture of you and someone important to you- Text explaining why they are important to you.
* Wire bend a letters to form a word- add more text or pictures to go along with this art piece.
This weeks ideas